CELBRIDGE PRIMARY CARE CENTRE
Image Item
Image Item
Image Item

Features

  • Category: Contracting
  • Client:  Celbridge Primary Care Centre
  • Design Team: Architect: Hussey Architects LTD
  • Completion Date: September 2016
  • Location: Celbridge, Co.  Kildare
  • Value: €5.2M
  • Description:
    Construction of new three-storey fully-fitted Primary Care Centre comprising HSE, GP (Centric Healthcare), Tusla, and Pharmacy facilities with a gross floor area of 3,465m2.  The development included all associated services installations and site development works. The HSE area comprises consulting, clinical, intervention, physio, and assessment rooms; reception areas and staff offices and facilities.  The GP Centric Area comprises 4 No dental suites and associated facilities; consulting rooms; nurse treatment; reception, and waiting rooms.  The Ground floor includes a separate filly fitted out Tusla facility and a shell & core Pharmacy area. Electrical installations included power supply; general services; fire detection and alarm; security; CCTV; nurse call; comms & data; and access controls.  Mechanical services included heat pumps; hot and cold water services; water tanks and calorifiers; AHUs and ventilation systems; LPHW heating; rain water harvesting; and BMS system.  The main structure comprised in-situ concrete columns and beams; masonry walls; precast floors; steel frame roofing and canopy.  The building envelope (which achieved air tightness of 3.76 (m3/hr)/m2 at 50 Pa), included Soprema roofing; Aluclad windows and aluminium curtain walling; Tegral rainscreen panels; cedar cladding; acrylic render; and standard s/c render. All works completed over 13 months, including commissioning, proving, BCAR documentation, O+M Manuals, and Safety File completion.