Features
- Category: Contracting
- Client: Bord na Móna
- Design Team:
Architect: In House
Engineer: Punch Consulting Engineers
M&E: Delap & Waller Consulting Engineers - Completion Date: May 2013
- Location: Newbridge, Co. Kildare
- Value: €7M
- Description:
Bord Na Mona Drehid IVC – Design, build and commissioning of in-vessel composting turnkey facility. Facility is capable of processing 25,000 tonnes of biodegradable waste per annum and produce a compost for application to land. Waste Treatment Technologies (a Dutch specialist composting technology company) appointed for the design, supply and delivery, and installation of the composting process equipment. The works are designed and constructed to allow the operation of the works in compliance with EPA Waste License. All emissions during the construction, commissioning, performance testing and operational stages including emissions to air and water, dust, odour and noise comply with the EPA Waste License. We were also responsible for all laboratory testing requirements during the commissioning stages including the validation and approval of the works by the Department of Agriculture, Fisheries and Food.